The mixture is spread on the floor foundation with a prop and outlines to control the thickness.
When it hardens, the next stage is the smoothing which is normally done by machines which work with water.
After the smoothing is the plastering or pore closure.
Polishing finished the process.
Time for 100m2, about 2 weeks.